studio_indigo_logo_black
03 May 2018

Mews House in its final construction stage

  • Mews House in its final construction stage

    Our Charming Mews house located within the Royal Borough of Kensington and Chelsea is approaching its final construction phase.

    The site team hit a number of complex below ground and water issues over the duration of the build which we have now successfully over come,  completing the basement structure and poured the ground floor slab.

    Final touches are starting to be applied to level 1 and 2. The modifications to the upper floors, which include a 4 storey stair void and several additional windows, have elevated the spaces to something much lighter and brighter.

    We are very excited to see the final outcome.